Testimonial

Customers reviews

What people say?

“Total Specialist Maintenance were very accommodating regarding our strict return to service deadlines due to works being carried out within a live kitchen area. Rory was a pleasure to deal with and all site staff were knowledgeable and mindful of the hygienic requirements due to the works being carried out in a foodstuffs preparation area.”
Alexandra Palace
Zed Major – manhole sealing and pipe penetration sealing
"I would like to take this opportunity to thank you and your staff for the recent repair works to our 34-shop inspection pit at our Loughborough facility. The works were carried out in line with the submitted risk assessments and method statements and to a very high standard! The attitude and work ethic shown by Total Specialist Maintenance were greatly appreciated and in a good timely manner.

We shall not hesitate to use you and your company again if required nor would we hesitate to recommend you to others.

Once again thank you for a job well done!"
Wabtec
Alan Oakton
"Just a note to say thanks for all your efforts at the Tesco project in Dumfries. The store manager complimented Wojciech and Martin who worked under difficult circumstances and were very mindful of minimising disruption to the store.

The work carried out has completely cured the water ingress into the system and we will hopefully have a requirement for your services in future."
Block Aid Drain cleaning
Richard Fraser –Director – Manhole sealing works
"I would like to express how impressed we are all at BPH rail with the speed in which you delivered the works, from the enquiry stage through to completion, and all before the Christmas shut down which was really appreciated and enabled us to complete all of our works to programme allowing us all to enjoy Christmas!"
BPH Rail & Civil Engineering Limited
Lee Chapman – Operations Director – ground stabilisation works
"I and my Directors are extremely pleased with the injection waterproofing solution that has exceeded our expectations with minimal disruption to the station and the travelling public.

Our Client Network Rail is also delighted with the result and the final finish of anti-graffiti which has further enhanced the station entrance.

We look forward to working with your team again and I would have no hesitation in recommending your services to my colleagues within Galliford Try"
Galliford Try
Richard Holt – Project Manager – Bridge Deck Waterproofing
"Firstly, I would like to thank the staff on site this weekend for their hard work they are a credit to you!

As all the grouting works were completed this weekend, we won’t require any further shifts on this project as it’s complete, but we will definitely be using you on future projects."
Network Rail
Dan Bedworth – Works delivery supervisor – structural grouting works
"Both Jonathan and I would like to thank you for turning this job around so quickly for us to enable us to get on with our final finishes."
North East Civils Ltd
Shaun Myerscough – Director – Leak sealing resin injection
"I would like to pass on my thanks to both you and Chris (your site foreman).
The quality of the work and compliance with health and safety has been second to none."
SDM Fabrication Limited
Richard Melton – Director – Movement joint waterproofing
"We are over the moon with Total Specialist Maintenance and the site operatives. The works to the new outdoor learning centre are just what we wanted making it safe for the children to use.

Our Senior Management Team have had nothing but praise for the quality of work that has been carried out. All in all, a fantastic result and we’re very pleased."
The Dales School
James Groundwater – Outdoor learning – Ballast bonding
"Thanks to you and all of your staff our client Network Rail is very happy with all the work that was delivered under some challenging circumstances."
Amco Giffen
Pedro Ventura – Sub Agent – Injection Waterproofing
"The restoration team have asked me to pass on their thanks for the complicated jacking of the stone pillar on the front facade of Windlestone Hall.

The coordination between you and the restoration team was exemplary to ensure that the stone pillar was jacked into place without issue."
Windlestone Park Estate
Steven Robertson – Chief Of Staff – Ground stabilisation
"Really impressed with the manholes that have been refurbished and relined they look fantastic."
Winvic
Craig Dixon – Senior Engineer – Manhole lining
"When faced with the complex problem of completing a large excavation in unstable sands and gravels next to a Grade II listed building, we wanted to ensure that we could use the best methodology and personnel to provide a solution. For the deep excavation section in the northwest of the site, we realised conventional piling methods would not be appropriate due to the limited space and proximity of existing buildings. We knew that some form of ground improvement would be necessary, but were unsure as to the best method and product. Our primary concerns were the protection of the existing buildings and the general environment; the speed of the work; and the health and safety of the ground workers.

Total Specialist Maintenance was able to provide us with a solution that addressed all of the above concerns. The trial undertaken prior to commencement of the project showed us how successful the polymer injection system was, and reinforced our confidence in using the system on a larger scale.

Throughout the works, the TSM Technicians and Management team provided a superb service, by ensuring the ground stabilisation was undertaken integrally with other parts of the construction works. The team really knew their trade and were able to react according to the ground conditions uncovered as the excavation progressed. The excavation and underpinning works were able to be advanced rapidly and efficiently, and the primary aim of stopping ground movement to protect the existing buildings was achieved. Well done TSM!"
Construction Contractor Anonymous