Injection Waterproofing Solutions for Railway Contractor in Scotland
In railway infrastructure, effective waterproofing is essential to prevent damage and ensure safety. This project in Scotland involved Total Specialist Maintenance (TSM) collaborating with a rail contractor to address critical waterproofing needs for a railway tunnel.
The Challenge
The client required urgent waterproofing for localised areas of masonry to stop running water that was damaging brickwork, overhead powerlines, and the track. This situation posed significant risks to safety and operational efficiency. Immediate action was necessary to mitigate these issues and protect essential infrastructure. Key challenges included:
- Damage to Brickwork: Continuous water ingress was leading to the deterioration of the masonry, threatening the structural integrity of the tunnel.
- Impact on Overhead Powerlines: Water exposure posed risks to the overhead powerlines, which were crucial for train operations.
- Safety Risks for Rail Operations: The presence of water on the track could lead to operational disruptions and safety hazards for both trains and personnel.
The Solution
TSM executed a comprehensive waterproofing strategy during a six-week unrestricted blockade, allowing for uninterrupted work on the project. The approach included several critical steps:
- Injection Waterproofing: TSM conducted targeted injection waterproofing to arrest water ingress through the masonry tunnel lining at various locations. This method involved the use of specialised waterproofing resins that penetrated the masonry, creating a barrier against moisture.
- Addressing Structural Integrity: In addition to waterproofing, TSM focused on resolving issues related to the degradation of brickwork, overhead powerlines, and the track. This comprehensive assessment ensured that all affected areas were restored to a safe and functional condition.
Project Management Excellence
TSM’s project management team ensured that all aspects of the waterproofing works were executed efficiently and effectively. By coordinating closely with the rail contractor, TSM minimised disruptions to rail services and maintained clear communication throughout the project. The team adhered to strict timelines, completing the work within the six-week blockade period.
Quality Assurance and Safety
Safety was a top priority during the project. TSM implemented rigorous quality assurance protocols to ensure that all work met industry standards and client specifications. The team adhered to safety guidelines to protect workers and the public, maintaining a secure working environment throughout the project.
Environmental Considerations
The materials used in the waterproofing process were environmentally friendly, posing no risk to the surrounding ecosystem. TSM’s commitment to sustainable practices ensured that the project aligned with best practices for environmental safety.